Spicy Smut Reader Falling For The Villain One Page At A Time Impact Tech Backpack
$64.99
Designed and sold by BestStoreIZ
Color: black
Color: black
Size:
$64.99
-
Related Designs
-
Design Details
-
Product Details
- 18"h x 11.5"w x 5"d
- Polyester
- Backpack
- Polyester
Machine Washable safe to be washed in a washing machine. Wash inside out: To protect the decoration on the t-shirt, it is recommended to wash it inside out. This will help prevent fading or cracking of the design. Cold water: Use cold water for washing your product to keep the fabric and color from fading or shrinking. Dry low heat: After washing, it is recommended to tumble dry on low heat. This will help to maintain the shape and size of the t-shirt. Tumble dry: Tumble drying on low heat is the recommended method for drying. Do not iron decorated areas: To preserve the design on your t-shirt, it is important not to iron over the decorated areas. Doing so may cause damage to the design and decrease its longevity. Note: Always follow the care label instructions on the for best results.
Indulge your spicy fantasies with our "Spicy Smut Reader Falling For The Villain One Page At A Time" Impact Tech Backpack. This daring design combines a love for all things naughty with a touch of darkness, perfect for those who can't resist a magnetic villain. Whether you're a fan of steamy romance novels or enjoy the thrill of the forbidden, this Impact Tech Backpack is sure to spark conversations and turn heads. Embrace your inner temptress and show off your love for complex characters with this seductive Impact Tech Backpack. Add a touch of heat to your wardrobe and let your imagination run wild.
This Design is trending!
people viewed this Design!
Spicy Smut Reader Falling For The Villain One Page At A Time Impact Tech Backpack FAQ
- 18"h x 11.5"w x 5"d
- Polyester
- Backpack
- Polyester
Once you place an order, you will have full visibility of the status step by step. Create an account with us or sign up to receive text and email updates.
- Received: Order received by TeeShirtPalace
- Processing: Order is in production, including pulling, printing, and shipping
- Shipped: Order shipped; tracking provided via email, text, and account
- Delivered: Item delivered to your shipping address
- Standard: Arrives in 3-7 business days
- Expedited: Arrives in 3-5 business days
- Second Day: Arrives in 2-4 business days
- Next Day: Arrives in 1-3 business days