Color: black
Color: black
Size:
$64.99
-
Related Designs
-
Design Details
-
Product Details
- 18"h x 11.5"w x 5"d
- Polyester
- Backpack
- Polyester
Machine Washable safe to be washed in a washing machine. Wash inside out: To protect the decoration on the t-shirt, it is recommended to wash it inside out. This will help prevent fading or cracking of the design. Cold water: Use cold water for washing your product to keep the fabric and color from fading or shrinking. Dry low heat: After washing, it is recommended to tumble dry on low heat. This will help to maintain the shape and size of the t-shirt. Tumble dry: Tumble drying on low heat is the recommended method for drying. Do not iron decorated areas: To preserve the design on your t-shirt, it is important not to iron over the decorated areas. Doing so may cause damage to the design and decrease its longevity. Note: Always follow the care label instructions on the for best results.
Shop Summer Beach Time Port Authority ® Impact Tech Backpack custom made just for you. This streamlined pack has a modern, heathered fabric and keeps your laptop and other must-haves organized and secure. Designs are available in many unique styles and colors. Note: Bags not intended for use by children 12 and under. Print is high quality Direct to garment technology with water biased inks. • 300 denier twill polyester • Spacious main compartment • Dedicated back laptop compartment • Front zippered valuables pocket • Front zippered pocket with organization panel • Side expandable pocket • Adjustable slide sternum strap • Padded air mesh back panels and shoulder straps • Integrated carry handle • Metal zipper pulls • Luggage trolley pass through on back • Laptop dimensions: 17"h x 12"w x 1"d; fits most 15" laptops • Dimensions: 18"h x 11.5"w x 5"d; Approx. 1,035 cubic inches
This Design is trending!
people viewed this Design!
Summer Beach Time Impact Tech Backpack FAQ
- 18"h x 11.5"w x 5"d
- Polyester
- Backpack
- Polyester
Once you place an order, you will have full visibility of the status step by step. Create an account with us or sign up to receive text and email updates.
- Received: Order received by TeeShirtPalace
- Processing: Order is in production, including pulling, printing, and shipping
- Shipped: Order shipped; tracking provided via email, text, and account
- Delivered: Item delivered to your shipping address
- Standard: Arrives in 3-7 business days
- Expedited: Arrives in 3-5 business days
- Second Day: Arrives in 2-4 business days
- Next Day: Arrives in 1-3 business days